Desert ApocalypseThe Last Stand for the Mojave and Great Basin Deserts
  • Home
  • Blog
  • Sign Our Petition
  • Subscribe
  • Contribute
Desert ApocalypseThe Last Stand for the Mojave and Great Basin Deserts
  • Home
  • Blog
  • Sign Our Petition
  • Subscribe
  • Contribute

Header for all pages

June 14, 2018 96Views 0Likes
  • Home
  • Blog
  • Sign Our Petition
  • Subscribe
  • Contribute

Header for all pages

Post navigation

Previous post:
Footer 3
June 6, 2018
Next post:
Header Home 1
June 18, 2018

Episode 1

Episode 2

Episode 3

Season 2, Episode 1

Categories
  • Climate Change
  • Petitions
  • Season 2
  • Solar Projects
  • Wildlife
Tags
Climate Change desert habitat desert tortoise Extinction Crisis large-scale-solar renewable energy Save The Desert solar power Stop Big Solar Yellow Pine Solar

Receive news

Nevada is moving forward with the GreenLink transmission system, which enables an unprecedented opening up of 9 million acres of public lands for industrial energy development, mostly solar, with no regard for the fragile but rich ecosystems in the Mojave and Great Basin. Desert Apocalypse, as the name suggests, is an exposé of this plan to destroy our deserts.

Useful Links

  • About Basin and Range Watch
  • Subscribe to Basin & Range Watch
  • Support This Series
  • Justin McAffee on Twitter

Popular Posts

  • How Solar Projects Affect Desert Habitats – Desert Apocalypse Season 2, Episode 1
  • The Fundamental Problem With Focusing Solely On Climate Change
  • Yellow Pine Solar Desert Tortoise Deaths Makes News

Desert Apocalypse© 2021. All Rights Reserved.

Support This Series